Fabricate carbon steel swimming pool for Portlethen facility. Pool constructed in two 12m x 3m, and one 1.5m prefabricated sections for final assembly on-site. Mid height walkway platform fabricated with handrails and GRP grating. Shotblasted and coating externally with high build epoxy. Internal lining shotlbasted and coated using a two component epoxy glassflake suitable for chlorinated water.
The brief was to build a sectional training pool to be assembled on-site with limited access and size constraints.
Our team designed and built the training pool in three pre-fabricated sections, each of which was coated and then assembled on-site.
The upgrade of the Training Pool will ensure that Maersk Training can meet the needs of the industry in today’s current climate.
“Derek and the team were very accommodating at all stages of the project and the build. Regular updates and design ideas were provided to give the best quality and economy. H & F Moir team worked well with other contractors during the on-site installation of the pool. Excellent product and service quality, project management, documentation, planning and delivery.”